SLDC Submission & Revision Windows — Tamil Nadu
Tamil Nadu SLDC (TANTRANSCO)Revision submissions through TANTRANSCO portal with 6 blocks lead time.
Applicable Deviation Penalty Slabs
Under TNERC (Forecasting, Scheduling and Deviation Settlement Mechanism for Solar and Wind Generating Sources) Regulations, the following deviation penalty schedule is enforced per 15-minute time block:
High-Wind Monsoon Season & Southern Corridor Evacuation
During the southwest monsoon (May to September), wind speeds through the Palghat and Shencottah gaps surge, creating high evacuation loading on TANTRANSCO 110/230 kV lines.
Grid backing down instructions during peak wind periods require tight schedule revision coordination to claim deemed generation benefits.
- •Severe wind gust ramps in pass corridors during pre-monsoon.
- •High concentration of low-voltage connected sub-50 MW wind farms.
Automate Tamil Nadu SLDC Scheduling with REFlux
REFlux integrates directly with Tamil Nadu SLDC (TANTRANSCO) submission templates, tracking the 6-block revision window and providing single-click schedule revisions.