SLDC Submission & Revision Windows — Maharashtra
Maharashtra SLDC (MSETCL - Kalwa)Submitted through MahaSLDC scheduling system with 6-block advance window.
Applicable Deviation Penalty Slabs
Under MERC (Forecasting, Scheduling and Deviation Settlement Mechanism for Solar and Wind Generators) Regulations, the following deviation penalty schedule is enforced per 15-minute time block:
Open Access Solar & Industrial Offtake in Maharashtra
Maharashtra has a high proportion of open-access and captive solar projects feeding energy directly to industrial consumers in Pune, Mumbai, and Aurangabad corridors.
Deviation settlement reconciliations must match MSEDCL billing statements and open-access banking cycles.
- •Mismatch between captive generation banking logs and SLDC schedule actuals.
- •Strict compliance enforcement for commercial open access feeders.
Automate Maharashtra SLDC Scheduling with REFlux
REFlux integrates directly with Maharashtra SLDC (MSETCL - Kalwa) submission templates, tracking the 6-block revision window and providing single-click schedule revisions.
